The Northeast Gas Distribution Council Technical Conference & Tradeshow brings together gas utility professionals focused on maintaining safe, reliable and efficient distribution systems. This year, William Winkler, Kobus, will take the stage to present on a topic that continues to gain momentum across the industry: general pipe pulling methods for service line replacement.
As utilities work to modernize aging gas infrastructure while minimizing disruption and maintaining safety standards, pipe pulling has become an increasingly valuable technique. William’s presentation will provide a practical overview of how and when pipe pulling can be effectively implemented within gas distribution programs.
Addressing Today’s Gas Distribution Challenges
Gas utilities face ongoing pressure to replace aging service lines, manage costs and reduce impact on customers and communities. Traditional excavation methods often require significant surface restoration, traffic control and labor resources.
Pipe pulling offers an alternative approach that supports:
- Reduced surface disruption
- Improved job site safety
- Controlled, repeatable installation processes
- Efficient use of crews and equipment
During his session, William will walk attendees through the fundamentals of pipe pulling, including key considerations for planning, site conditions, equipment selection and risk management. The presentation is designed to provide clear, actionable insight for utility engineers, construction managers and field supervisors.
Practical Insights for Utility Professionals
This session will focus on real-world application rather than theory. Attendees can expect discussion around:
- How pipe pulling compares to traditional excavation methods
- When trenchless service line replacement is most effective
- Common field challenges and how to address them
- How utilities can integrate pipe pulling into broader replacement programs
With experience supporting gas utilities across North America, William brings a practical perspective grounded in field operations and program implementation.
Connect with William at NEGDC
If you are attending the NEGDC, be sure to join William Winkler’s presentation and take advantage of the opportunity to discuss your current service line replacement initiatives.
To learn more about pipe pulling methods or to continue the conversation after the event, connect directly with William and explore how Kobus supports gas utilities in modernizing distribution systems with trenchless solutions.
We look forward to seeing you at the meeting.
